Public/Private School
* Denotes Featured Project.
Arizona
-
Desert Canyon Too, Montessori School
LOCATION:
Phoenix, Arizona
PROJECT DETAILS:
This project consisted of the interior renovation of an existing daycare facility into classes for elementary students. The facility is an extension of Desert Canyon School.
Desert Canyon Too, Montessori School -
Destiny School
LOCATION:
Globe, Arizona
PROJECT DETAILS:
Arrington Watkins designed two new classroom buildings containing 16 classrooms each. Tight site constraints limited the placement and size of the new buildings.
Destiny School -
Dobson Academy
LOCATION:
Mesa, Arizona
PROJECT DETAILS:
Remodel of an existing muli-purpose and addition of two-story classroom building for 600 students.
Dobson Academy -
Enterprise Academy School Expansion
LOCATION:
Phoenix, Arizona
PROJECT DETAILS:
Arrington Watkins designed a three classroom building addition to an existing campus.
Enterprise Academy School Expansion -
Hearn Academy
LOCATION:
Phoenix, Arizona
PROJECT DETAILS:
Located in Phoenix, Arrington Watkins designed this facility on a five acre site. Project includes administrative offices, gymnasium/cafeteria, library, and 23 classrooms. Located along a major wash provide the site with a desert view and a buffer zone but required additional flood plain design.
Hearn Academy -
Las Artes Community Mosaic Arts Program
LOCATION:
Phoenix, Arizona
PROJECT DETAILS:
Arrington Watkins was contracted by Maricopa County to create new classroom space, workspace, offices, toilets and appropriate mechanical areas while maintaining the exterior facade historic Santa Fe Depot. This project will house the Las Artes Community Mosaic Arts Program.
Las Artes is a community arts program that addresses the educational needs of dropout and at-risk youth.
Las Artes Community Mosaic Arts Program -
New Century School
LOCATION:
Phoenix, Arizona
PROJECT DETAILS:
The project includes 4 new classroom buildings (13 classes and offices). Existing classrooms buildings were renovated as well as the administrative offices, multi-purpose building, and gymnasium. In addition to physical reconfiguration of rooms, many of the existing buildings was brought up to current codes requiring new ADA fixtures, updated mechanical systems and a new campus wide fire alarm system.
New Century School -
North Pointe Preparatory Academy
LOCATION:
Phoenix, Arizona
PROJECT DETAILS:
In this project one new classroom/restroom building (8 classes) was added to an existing site.
North Pointe Preparatory Academy -
Northern Avenue School
LOCATION:
Phoenix, Arizona
PROJECT DETAILS:
This project was for two small schools, a high school and an elementary, sharing the same 5 acre site in Phoenix, Arizona. This project was never built due to funding difficulties.
Northern Avenue School -
SRP / MIC School Building

LOCATION:
Scottsdale, Arizona
PROJECT DETAILS:
When Salt River Pima / Maricopa Indian Community was faced with replacing their elementary school due to safety concerns, they contracted Arrington Watkins to site adapt a previous project's building. The previous design was duplicated twice, reprogrammed and redesigned to create a new K-12 campus for the community's students. This campus will be used until the new facility is constructed. After that, the community will readapt the site for other administrative/community functions.
SRP / MIC School Building